GET https://api.rollstack.com/public/v1/reports/{id}/content

What a viewer sees on a report's visible slides: titles, text, and each chart's and table's values. On a long report, pass slideIds for only the slides you need, such as a reply's changedSlideIds.

Requires the slide_decks:read scope.

Operation ID: getReportContent.

Path parameters

  • id (string, required): The report to act on, by its id from listReports or createReport. Only reports whose type is SlideDeck work here: another type, such as a Google Slides presentation, returns 400. You can also copy it from the report's link in Rollstack: it's the part right after /slides/.

Query parameters

  • slideIds (string or array of string): The slides to return, from a reply's changedSlideIds or an earlier getReportContent call. If omitted, every visible slide is returned. Hidden slides and ids that are not slides of the report are ignored. Up to 20 ids: repeat the parameter for each one, as in ?slideIds=a&slideIds=b. Example: f1e2d3c4-b5a6-4978-8a1b-2c3d4e5f6a7b.

Response 200

Success

application/json

  • slides (array of object, required): The report's visible slides in report order, or only those in slideIds. Hidden slides are never included.
    • index (number, required): The slide's position in the report as viewers see it, counting only visible slides and starting at 0. It stays the same when slideIds narrows the list.
    • id (string, required): Identifies the slide. Pass it in slideIds to getReportSlideImages or exportReport, or to sendReportMessage to tell the slides agent which slides your message is about.
    • title (string or null, required): The slide's title: the text in its title box. null when the slide has no title box, or the box is empty.
    • texts (array of string, required): The text of each text box and shape on the slide, title included. Text from the slide's master and layout is left out, and so are empty boxes.
    • charts (array of object, required): The charts on the slide, with the data each one shows.
      • title (string or null, required): The chart title shown on the slide. null when the chart has no title, and always for a table.
      • type (string, required): What kind of chart it is: bar, line or pie. A chart that combines kinds, such as bars with a line, takes the kind of its first series, and a chart with no series is chart. Always table for a table.
      • values (object, required): The data the chart or table shows, as columns and rows.
        • columns (array of string, required): The column headers: for a chart, the names of the data columns it draws; for a table, the text of its first row.
        • rows (array of array of string or number or null, required): The data, one array per row, with its values in the order of columns. A chart's numbers are raw values, before the chart's number format is applied; a table's cells are text. At most 200 rows; truncated says whether there were more.
        • truncated (boolean, required): Whether the chart or table has more than 200 rows, in which case rows contains only the first 200.
    • tables (array of object, required): The tables on the slide, with the text of their cells. A table's first row is returned as its columns, and the other rows as its rows.
      • title (string or null, required): The chart title shown on the slide. null when the chart has no title, and always for a table.
      • type (string, required): What kind of chart it is: bar, line or pie. A chart that combines kinds, such as bars with a line, takes the kind of its first series, and a chart with no series is chart. Always table for a table.
      • values (object, required): The data the chart or table shows, as columns and rows.
        • columns (array of string, required): The column headers: for a chart, the names of the data columns it draws; for a table, the text of its first row.
        • rows (array of array of string or number or null, required): The data, one array per row, with its values in the order of columns. A chart's numbers are raw values, before the chart's number format is applied; a table's cells are text. At most 200 rows; truncated says whether there were more.
        • truncated (boolean, required): Whether the chart or table has more than 200 rows, in which case rows contains only the first 200.